Boiling House Expansion

Boiling House Expansion

SCOPE OF WORK INCLUDED: DESIGN OF VACUUM PAN SYSTEM ASSIST STRUCTURAL ENGINEERS WITH STRUCTURAL DESIGN FABRICATION OF STRUCTURAL STEEL 135 TONS FABRICATION OF (2) 2,800 CF BATCH VACUUM PANS, (1) BAROMETRIC CONDENSER, ALL MAJOR VAPOR LINES; (2) MIXING RECEIVERS (148...

Brine Piping

Brine Piping

TOTAL OF 2,725 LF OF 6” SCH 40 316LSS PIPING300 LF OF UNDERGROUND 6” SCH 40 316LSS PIPING245 WELDS; ALL WELDS WITH INCONEL 625 GTAW; 100% RT65 CONCRETE PIPE SUPPORT BASES

Triple Effect Evaporator System (Construction and Fabrication)

Triple Effect Evaporator System (Construction and Fabrication)

SCOPE OF WORK INCLUDED: DESIGN OF EVAPORATION SYSTEM ASSIST STRUCTURAL ENGINEERS WITH STRUCTURAL DESIGN FABRICATION OF STRUCTURAL STEEL 150 TONS FABRICATION OF (3) 17,000 SF EVAPORATORS, (1) BAROMETRIC CONDENSER, ALL MAJOR VAPOR LINES; 148 TONS INSTALLATION OF...

Storage Tanks

Storage Tanks

SCOPE OF WORK: 4,000,000 GALLONS OF STORAGE TANK CAPACITYSITE PREPERATIONFOUNDATIONSTANK DESIGN AND CONSTRUCTIONALL FEED AND DISCHARGE PIPING120’-0” DIA X 24’-0” TALL (EACH TANK)CAPACITY : 2,000,000 GALLONS PER TANKAPPROXIMATELY 750 TONS OF STEEL

Burner Gas Cooler

Burner Gas Cooler

516 1.5” O.D. TUBESSHELL THICKNESS 1.5”MATERIALS USED: SA516-70N, SB443-625(INCONEL), SA240-2205, SA268-TP405SSWEIGHT 25 TONS

Pre-Evaporator

Pre-Evaporator

35,000 SF OF HEATING SURFACE10,974 1.75” O.D. 304LSS TUBES85.5 TONS