PROJECT

Triple Effect Evaporator System (Construction and Fabrication)

SCOPE OF WORK INCLUDED:

DESIGN OF EVAPORATION SYSTEM
ASSIST STRUCTURAL ENGINEERS WITH STRUCTURAL DESIGN
FABRICATION OF STRUCTURAL STEEL 150 TONS
FABRICATION OF (3) 17,000 SF EVAPORATORS, (1) BAROMETRIC CONDENSER, ALL MAJOR VAPOR LINES; 148 TONS
INSTALLATION OF FOUNDATION
INSTALLATION OF STRUCTURAL STEEL
ALL EQUIPMENT SETTING
INSTALLATION OF 17,178 1.5” O.D. COPPER TUBES (3 UNITS COMBINED)