skip to Main Content
Pre-Evaporator
« 1 of 6 »

PRE-EVAPORATOR

  • 35,000 SF OF HEATING SURFACE
  • 10,974 1.75” O.D. 304LSS TUBES
  • 85.5 TONS
Burner Gas Cooler
« 1 of 2 »

BURNER GAS COOLER

  • 516 1.5” O.D. TUBES
  • SHELL THICKNESS 1.5”
  • MATERIALS USED: SA516-70N, SB443-625(INCONEL), SA240-2205, SA268-TP405SS
  • WEIGHT 25 TONS
Storage Tanks
« 1 of 10 »

STORAGE TANKS

SCOPE OF WORK:

  • 4,000,000 GALLONS OF STORAGE TANK CAPACITY
  • SITE PREPERATION
  • FOUNDATIONS
  • TANK DESIGN AND CONSTRUCTION
  • ALL FEED AND DISCHARGE PIPING
  • 120’-0” DIA X 24’-0” TALL (EACH TANK)
  • CAPACITY : 2,000,000 GALLONS PER TANK
  • APPROXIMATELY 750 TONS OF STEEL
Triple Effect Evaporator System
« 1 of 6 »

TRIPLE EFFECT EVAPORATOR SYSTEM (construction and fab)

SCOPE OF WORK INCLUDED:

  • DESIGN OF EVAPORATION SYSTEM
  • ASSIST STRUCTURAL ENGINEERS WITH STRUCTURAL DESIGN
  • FABRICATION OF STRUCTURAL STEEL 150 TONS
  • FABRICATION OF (3) 17,000 SF EVAPORATORS, (1) BAROMETRIC CONDENSER, ALL MAJOR VAPOR LINES; 148 TONS
  • INSTALLATION OF FOUNDATION
  • INSTALLATION OF STRUCTURAL STEEL
  • ALL EQUIPMENT SETTING
  • INSTALLATION OF 17,178  1.5” O.D. COPPER TUBES (3 UNITS COMBINED)
Brine Piping
« 1 of 15 »

BRINE PIPING

  • TOTAL OF 2,725 LF OF 6” SCH 40 316LSS PIPING
  • 300 LF OF UNDERGROUND 6” SCH 40 316LSS PIPING
  • 245 WELDS; ALL WELDS WITH INCONEL 625 GTAW; 100% RT
  • 65 CONCRETE PIPE SUPPORT BASES
Boiling House Expansion
« 1 of 12 »

BOILING HOUSE EXPANSION

SCOPE OF WORK INCLUDED:

  • DESIGN OF VACUUM PAN SYSTEM
  • ASSIST STRUCTURAL ENGINEERS WITH STRUCTURAL DESIGN
  • FABRICATION OF STRUCTURAL STEEL 135 TONS
  • FABRICATION OF (2) 2,800 CF BATCH VACUUM PANS, (1) BAROMETRIC CONDENSER, ALL MAJOR VAPOR LINES; (2) MIXING RECEIVERS (148 TONS)
  • INSTALLATION OF FOUNDATION
  • INSTALLATION OF STRUCTURAL STEEL
  • ALL EQUIPMENT SETTING
  • INSTALLATION OF 3,840  3.5” O.D. COPPER TUBES (2 UNITS COMBINED)
Back To Top