PROJECT

Boiling House Expansion

SCOPE OF WORK INCLUDED:

DESIGN OF VACUUM PAN SYSTEM
ASSIST STRUCTURAL ENGINEERS WITH STRUCTURAL DESIGN
FABRICATION OF STRUCTURAL STEEL 135 TONS
FABRICATION OF (2) 2,800 CF BATCH VACUUM PANS, (1) BAROMETRIC CONDENSER, ALL MAJOR VAPOR LINES; (2) MIXING RECEIVERS (148 TONS)
INSTALLATION OF FOUNDATION
INSTALLATION OF STRUCTURAL STEEL
ALL EQUIPMENT SETTING
INSTALLATION OF 3,840 3.5” O.D. COPPER TUBES (2 UNITS COMBINED)